01
Delivery exception
A high-value load arrives against a revised work package.

Construction and infrastructure security across Southeast Europe. Controlled gates, contractor verification, materials custody, and a live record that follows the project to handover.
Worksites change every day. Security has to follow new gates, crews, deliveries, and exposed assets without losing the record that owners and insurers depend on.
01
A high-value load arrives against a revised work package.
02
The gate team holds release and contacts the authorised manager.
03
Seal, quantity, recipient, and storage location are captured.
04
The evidence joins the site audit trail and insurer record.
Each capability has a physical owner, a live platform state, and an evidence trail. Select a chapter to see how the pair works together.
Perimeter controls
Live operational layer
Current state
Live
Within response plan
Evidence
Contractor verification

Field record
Tirana construction programme
The perimeter is a process, not a fence. Vehicles checked at entry, contractors verified at induction, materials photographed at delivery, the site walked end-to-end before lockup. The handover log is the record.
Progress continues while materials, people, and responsibility remain visible.

Perimeter events, delivery custody, patrol exceptions, and compliance evidence follow the project from groundworks to handover.
Same event, every role, one record
Perimeter Console
Tirana construction programme
Live workspace
Live thermal-camera feeds, breach alerts, gate logs, contractor presence. Every signal across the site on a single screen.
Delivery exception
A high-value load arrives against a revised work package.
Custody verified
Seal, quantity, recipient, and storage location are captured.
Handover ready
The evidence joins the site audit trail and insurer record.
Active task
Delivery exception
A high-value load arrives against a revised work package.
Next action
Acknowledge and verify
Worksite control
Active project
Day 184, live
SYNC 16:51:12
Thermal sensor EF-04 · Phase 3
146
All inducted
23
Manifest matched
100%
Last cycle clear
99.4%
One sensor review
Perimeter console
Gates, thermal lines, active zones, contractors, and patrols
Delivery exception
WKS-1706Tirana construction programme
Connected evidence chain
Delivery exception
The same event survives every handover.
Delivery exception
WKS-1706 · Tirana construction programme
captured
Custody verified
Seal, quantity, recipient, and storage location are captured.
verified
Handover ready
WKS-1706 · owner record
shared
Live event stream
Ordered by operational relevance
High-value delivery reconciled
Materials zone
Patrol cycle verified
East perimeter
Delivery exception
Tirana construction programme
One incident, four accountable views
WKS-1706 · 16:51
Delivery exception
Tirana construction programme
Delivery exception
A high-value load arrives against a revised work package.
Custody verified
Seal, quantity, recipient, and storage location are captured.
Receipt controlled
The gate team holds release and contacts the authorised manager.
Handover ready
The evidence joins the site audit trail and insurer record.
Project overview
All deliveries match. One perimeter sensor is under review.
Receipt controlled
The gate team holds release and contacts the authorised manager.
Delivery exception
Delivery exception
Seal, quantity, recipient, and storage location are captured.
16:51 · Tirana construction programme
Evidence continuity
WKS-1706Project overview
All deliveries match. One perimeter sensor is under review.
Receipt controlled
The gate team holds release and contacts the authorised manager.
Delivery exception
Delivery exception
Seal, quantity, recipient, and storage location are captured.
16:51 · Tirana construction programme
Evidence continuity
WKS-1706Follow WKS-1706 through live context, coordinated response, and owner-ready evidence.
01 / 03
Thermal lines, gates, contractor presence, and alerts in one view.
Perimeter console
Gates, thermal lines, active zones, contractors, and patrols
Delivery exception
WKS-1706 · 16:51
Perimeter console
99.4% sensor health
02 / 03
Photo and timestamp evidence from receipt through installation.
One event, three accountable views
Each handoff adds context without changing the record.
Field officer
Custody verified
Seal, quantity, recipient, and storage location are captured.
Operations
Receipt controlled
The gate team holds release and contacts the authorised manager.
Client owner
Handover ready
Progress continues while materials, people, and responsibility remain visible.
Materials tracker
23 loads matched
03 / 03
A handover-ready record for owners, contractors, and insurers.
Connected evidence chain
The response arrives in the owner view as one reviewable outcome.
Delivery exception
WKS-1706 · Tirana construction programme
captured
Custody verified
Seal, quantity, recipient, and storage location are captured.
verified
Handover ready
WKS-1706 · owner record
shared
Owner outcome: Progress continues while materials, people, and responsibility remain visible.
Site audit trail
100% patrol proof
WKS-1706 at Tirana construction programme, recorded at 16:51.
Thermal lines, gates, contractor presence, and alerts in one view.
Delivery exception. Gates, thermal lines, active zones, contractors, and patrols
Photo and timestamp evidence from receipt through installation.
Field officer: Seal, quantity, recipient, and storage location are captured.
Operations: The gate team holds release and contacts the authorised manager.
Client owner: Progress continues while materials, people, and responsibility remain visible.
A handover-ready record for owners, contractors, and insurers.
Delivery exception: WKS-1706 · Tirana construction programme. Status: captured.
Custody verified: Seal, quantity, recipient, and storage location are captured.. Status: verified.
Handover ready: WKS-1706 · owner record. Status: shared.
Owner outcome: Progress continues while materials, people, and responsibility remain visible.
Take this operating loop live
Use the same event, owners, field actions, and evidence expectations to frame a controlled first deployment.
Start with the gate or asset category carrying the most exposure. The deployment grows from a controlled proof, with owners, response plans, data, and reporting agreed before the first live shift.
Walk the planned site. Map vulnerable corners. Specify cameras, fencing, and gate placements before ground-breaking.
Trained worksite officers on-shift before first delivery. Patrol routes drilled with the site manager.
Daily handover briefs. Weekly site-walk audits. Continuous tweaking as the site evolves.
Final security walk-through. Lockup of finished phase. Handover security pack to general contractor.
Progress continues while materials, people, and responsibility remain visible.
Gate → handover
One Chain
Shift-by-shift
Site View
Evidence-led
Custody
Exportable
Audit Record
Start with the gate or asset category carrying the most exposure. We will map the field response, the Guardly view, and the evidence your owners need to see.