01Industrial security

Know what crossed the gate and what happened next.

Gate, perimeter, and contractor operations for logistics, manufacturing, ports, and critical sites across Southeast Europe, joined to one live audit trail.

Sofia logistics campus Physical team + Guardly
02One operating loop

Every vehicle, person, and exception earns a trace.

A gate is only secure when the manifest, barrier decision, patrol response, and final release agree. OVIT joins those moments into one reviewable chain.

01

Manifest mismatch

A vehicle arrives with an unlisted contractor credential.

02

Barrier held

Control is notified while the gate officer starts verification.

03

Identity resolved

Supervisor approval and supporting evidence are logged.

04

Movement proved

The complete gate decision is ready for audit or investigation.

03What we deliver

Controlled entry. Accountable movement.

Each capability has a physical owner, a live platform state, and an evidence trail. Select a chapter to see how the pair works together.

OVITIllustrative product view

Gate-system integration

Live operational layer

Current state

Live

Within response plan

Evidence

Presence view

Signal received
Officer acknowledged
Record available
OVIT officer resolving a manifest exception at a Sofia logistics gate

Field record

Sofia logistics campus

IND-0832
04The gate is the audit

Every entry, recorded.

Plate reads are checked against the day's manifest before the barrier decision. Drivers are verified, containers are checked against the bill of lading, and anomalies escalate before entry is approved.

Site movement stays fast because exceptions are controlled, not improvised.
OVIT team coordinating live gate and perimeter operations
Operations in context
05Guardly 360

The perimeter becomes an accountable operating surface.

Gate control, presence, patrol, and evidence sit in one view for site leaders and regional owners.

Same event, every role, one record

OVIT
Illustrative interface

Live workspace

Gate Control 360

Live LPR feed across every entry point. Every plate, every driver, every load cross-checked against the day's manifest in real time.

IND-0832 · 09:56
Operational signalLive

Manifest mismatch

A vehicle arrives with an unlisted contractor credential.

Identity resolved

Supervisor approval and supporting evidence are logged.

Movement proved

The complete gate decision is ready for audit or investigation.

09:565G · 94%
OVIT

Active task

Identity resolved

IND-0832Now

Manifest mismatch

A vehicle arrives with an unlisted contractor credential.

Next action

Acknowledge and verify

09:565G · 96%
OVIT
Illustrative product viewIND-0832 · 09:56

Plant assurance

The site is fully accounted for.

One credential needs review before the next gate cycle.

Barrier held

Control is notified while the gate officer starts verification.

Identity resolvedField task

Manifest mismatch

Manifest mismatch

Supervisor approval and supporting evidence are logged.

09:56 · Sofia logistics campus

Manifest mismatch
Identity resolved
Movement proved

Evidence continuity

IND-0832
Manifest mismatchcaptured
Identity resolvedverified
Movement provedshared
Illustrative desktop and mobile interfaces for Industrial control. Fictional product data is shown for demonstration.
Illustrative product story

One incident becomes one accountable outcome.

Follow IND-0832 through live context, coordinated response, and owner-ready evidence.

01 / 03

Put the operating signal in context.

Plates, drivers, and loads checked against the live manifest.

Presence and gate control

Credentialed movement across active and restricted zones

Live context
ProductionRestrictedMuster 2

Manifest mismatch

IND-0832 · 09:56

Gate control 360

100% manifest match

02 / 03

Give every accountable role the same event.

Credentialed people and vehicles by zone with trail history.

One event, three accountable views

Each handoff adds context without changing the record.

IND-0832
01

Field officer

Identity resolved

Supervisor approval and supporting evidence are logged.

02

Operations

Barrier held

Control is notified while the gate officer starts verification.

03

Client owner

Movement proved

Site movement stays fast because exceptions are controlled, not improvised.

Presence map

284 people present

03 / 03

Turn the response into an owner-ready record.

Every entry, patrol, and exception ready for review.

Connected evidence chain

The response arrives in the owner view as one reviewable outcome.

IND-0832 · 09:56

Manifest mismatch

IND-0832 · Sofia logistics campus

captured

Identity resolved

Supervisor approval and supporting evidence are logged.

verified

Movement proved

IND-0832 · owner record

shared

Owner outcome: Site movement stays fast because exceptions are controlled, not improvised.

Audit timeline

0 unowned events

One incident becomes one accountable outcome.

IND-0832 at Sofia logistics campus, recorded at 09:56.

Put the operating signal in context.

Plates, drivers, and loads checked against the live manifest.

Manifest mismatch. Credentialed movement across active and restricted zones

Give every accountable role the same event.

Credentialed people and vehicles by zone with trail history.

Field officer: Supervisor approval and supporting evidence are logged.

Operations: Control is notified while the gate officer starts verification.

Client owner: Site movement stays fast because exceptions are controlled, not improvised.

Turn the response into an owner-ready record.

Every entry, patrol, and exception ready for review.

Manifest mismatch: IND-0832 · Sofia logistics campus. Status: captured.

Identity resolved: Supervisor approval and supporting evidence are logged.. Status: verified.

Movement proved: IND-0832 · owner record. Status: shared.

Owner outcome: Site movement stays fast because exceptions are controlled, not improvised.

Take this operating loop live

Begin at the gate with the highest exception volume.

Use the same event, owners, field actions, and evidence expectations to frame a controlled first deployment.

Scope this operating loop
06Mobilisation

From first walk to a live operating rhythm.

Begin at the gate with the highest exception volume. The deployment grows from a controlled proof, with owners, response plans, data, and reporting agreed before the first live shift.

01

Site survey

Walk the fence line. Map every entry, blind spot, and asset. Threat-model the operation.

02

Systems install

LPR cameras, biometric readers, perimeter sensors. Integrated with your existing access control.

03

Officer deploy

Officers mobilise to the agreed site plan and operating rhythm, with patrol protocols written for the operation.

04

Audit cadence

Monthly compliance reports. Quarterly protocol drills. Annual third-party security audit.

07Owner view

Proof you can use, not reports you have to chase.

Site movement stays fast because exceptions are controlled, not improvised.

Gate → audit

One Chain

Shift-wide

Operating View

Live

Presence State

Exportable

Event Record

Time-stampedEvidence attachedOwner-ready
09Start with a real site

Turn the next exception into a clear decision.

Begin at the gate with the highest exception volume. We will map the field response, the Guardly view, and the evidence your owners need to see.